5/16/19 

Temporary aggregate placement for driveway access will occur on: 

  • Manhattan Dr. on both sides of the roadway from Main St. To Allegheny Pass
  • Allegheny Pass on both sides of the roadway Manhattan Dr. To Capitol Ln.
  • Capitol Ln. on both sides of the roadway Potomac Dr. To Allegheny Pass
  • Douglas Ave. on both sides of the roadway Ruth Rd. To Capitol Ln.
  • Golden Gate Ave. on both sides of the roadway Capitol Ln. To Capitol Ln.
  • Nantucket Ln. (North) on both sides of the roadway Oregon Tr. To Nantucket Ln. South
  • Nantucket Ln. (South) on both sides of the roadway w/loop Goldengate Ave. To Nantucket Ln. North
  • Oregon Tr. on both sides of the roadway Nantucket Ln. To 100 ft East
  • Santa Fe Tr. on both sides of the roadway Nantucket Ln. To 100 ft East

 Storm Sewer under drain installations will occur on: 

  • Allegheny Pass on both sides of the roadway Manhattan Dr. To Capitol Ln.